The Warsak Dam/Hydroelectric Power Plant on the Kabul River is located 30 km from the city of Peshawar in Khyber Pakhtunkhwa province, in the Khyber/Mohmand Agency region.
The first phase, completed in 1960-61, consists of the dam, irrigation tunnels, four generating units each with a capacity of 40 MW (total 160 MW), a 132 kV switchyard, and transmission lines. In the second phase (1980-81), two more units, each with a capacity of 41.48 MW, were added, bringing the total capacity to 242.96 MW (approximately 243 MW).
We provided a total of six generator units, a fire detection system, a combined extinguishing system (water mist extinguishing system & inert gas extinguishing system), a network system, and data structured cabling system solutions.